All Projects
Projects by Roscoe
Project Video
Parts & Information
Mast & Boom Work
Raw Water Impeller
Replacing the Prop Zinc
Raw Water Filter
Wet Exhaust
Wind Speed Repair
Teak Work
Stuffing Box
Sea Cocks
Standing Rigging
Steering Refurbish
Cockpit Lockers
Drop Table
Build A Seahood
Part of the ongoing maintenance for a 25 year old sailboat is cleaning the barnacles and critters off of the speed sensor ...
Solar Panels
Rub Rails
Head Mirror & Towel Rack
Windstar Rebuild
Mast Removal & Stepping
Motor Mounts
Engine Maintenance
Repowering
Painting The Stove
Prop & Shaft
Anchor Sprit Support
Painting the Deck
Oil & Filter
Wind Vane Repair
Winch Re-Chroming
VHF and Sterio
New Stanchion
New Lectra-San
Mid Boom Travler
Mast Post Support
Achilles Inflatable
Lines to the Cockpit
Hatch Door
Canvas Work
Rebuilding the Mast Support
Lighting Protection
New Lifelines
Lazy Jacks
Jackline
Electrical
Exhaust-Westerbeke
Holding Tank Install
Holding Tank Design
Head Hatch Install
Haul Out
P35 Half Hull
New Halyards
Genoa Change Out
Fuel Filter
Fresh Water Flushing
Engine Rebuild
FaMet ReeFurl
Engine Rebuild
Engine Removal
Engine Reinstall
Engine Alignments
Engine Data
Doha Qatar
Backing Plates
Deck Work
Bilge Painting
Bleeding the Fuel
Centerboard Cable
Center Board Issues
Ballast Weight
3YM30 Yanmar Install
Engine Diagram
Exhaust
Companion Way Boards
Wind Generator Tower
A4 Rebuild
Anchor Locker
AC / DC / TV-ANT

 


 

All Projects

Add Your Project To This List!

Email


Project Video Collection

Installing Solar Panels

Mirror & Towel Rack

Center Board Cable

 

 

2007 Progress on Rebuilding WINDSTAR

Hatch Door

 

Cockpit Lockers

Holding Tank

Install

Rudder Post Packing

Anchor Bowsprit

Mast collar plate

Windlass

Lines to the Cockpit

Complete Canvas Rework

Oil Change Time

Oil Filter Research

Fuel Gage Pick-up

Motor Mounts

Wind Speed Indicator

Engine to Hot!

Wind Gen Tower

Engine Diagrams

A4 Rebuild

Anchor Locker

Small Drop

Down Table

A Bollard

A Corral

3YM30 Install

Exhaust

Ballast Question

AC/DC Electrical Outlet

Building a Half Hull

Companion Way

Boards

Head Hatch Install

Deck Painting

Mast Post

Transport

Power Plant

Seahood

Holding Tank

DC Wiring

ElectroSand

Fresh Water Plumbing

Water Maker

Ice Box Issues

Bilge Pumps

Fresh Water Flushing

Anchor Sprit Support

Rub Rails

SSB & Antenna

Bleeding the Fuel

Deck & Hull

Radar Mount

Mid Boom Traveler

New Stanchions

Wind Vane Repair

Painting the Stove

New Life Lines

Bilge Painting

Center Board Issues

Lazy Jacks

Wiring & Electrical

Haul Out & Mast Removal

Backing Plates

Radio Install

Winch Re-chrome

Solar Panels

Inflatables

Head Hatch

Thru Hulls

Steering Refurbish

Lectra-San

Prop & Zinc

Projects by Roscoe

Mast Head

Cleaning the speed Indicator

Jack Lines

Mast Post(2)

Exhaust

Teak Work

Standing Rigging

Fore Sail

New Running Rigging

Haul Out

Center Board Cable

Mast & Boom

Zinc Work

Replacing the Engine


Rudy Nickerson at D&R Marine

Gave me some info on what he has available for the Pearson 35

 

Item list

 

Rudder weight ~ 180 lbs

Center Board weight ~220 lbs

Has the Mast Step Upper/Lower

Sea Hood Mold $550

 


Projects by Roscoe

Page

1

Page

 2

Page

 3

Page

4

Page

 5

Page

 6

Page

7

Page

 8

Page

 9

Page

 10

In the Beginning

 

Cabinet Rework & Modifications

 

Cabinet Doors & Teak Rework

 

Companion Way

 

Tables Doors & Tables & Lockers

 

Handrails

 

SSB Cabinet

Westerbeke- W30 Engine Rebuild

 

Transmission

 

Engine Generator

Fuel Tank

 

Engine Generator

Fuel Tank

 

Pulling the Prop

Hull Repair & Painting

 

Bow Work

 

Bow Winch

 

Deck Painting

 

New Ports

Installation of new Beta Marine Engine

 

Exhaust

 

Engine Fuel Tank

 

Rework of Engine Mounting Brackets

Engine Control Stand

 

Radar Support Stand

 

DC Electrical Panel

 

Compass

 

Cockpit Shower

 

Original Traveler

 

New ID Plate

 

New Pole

Head Work

 

Lectra-San

 

Salon Painting

 

Water Maker

 

Pluming

 

Hot Water Heater

 

Bilge Pumps

Insulating the Ice Box

 

Cleats

 

Formica

 

Stations

Galley Sink

 

Propane Locker

 

Rigging

 

Mast

 

Boom

 

Upper Deck Painting

Finishing Up

 

Wind Generator Mount

 

Winches

 

Chain Plates

 

Radar Display

 

Wet Locker

 

Deck Lights


 

 

 

Engine Projects

Regular Engine Maintenance

 

 

 

 

Fuel Filter Replacement

 

Changing the Oil

 

Cleaning the Raw Water Filter

 

Pump Impeller Replacement

 

Replacing the Engine Zinc

 

Oil Cooler Information

 

 

 

Rebuilding the Westerbeke 30

 

 

 

 

 

 

The Data on the Engine

Removing the Engine

Rebuilding Process

Putting it all back in the Boat

 Aligning it all up

 

 

 

 

 

Speaking of Engines

Why not just take it out and use a "kicker."

P35 in Trinidad & Tobago, West Indies

 

 

 

 

 


Westerbeke W30 overhaul in

Voyager, a 1977 Allied Seawind Mark II ketch

 


Off Site Links for Boat Projects

 

Project

Description / Picture

Link & Credit

ZORA

S /V ZORA

Mariner 39' Sloop

Mast & Boom Painting

 

 

 

Replacement of the Atomic 4 Engine

Mother Load of Boat Projects

If you can't find a picture of DIY Boat Project here, no one has ever done it

1981 C&C

Landfall 38

Winterizing Sea Dragon

Claire & Garner Bennett

out of Alexandria, VA

maintain a wonderful web site for the The Pearson 365 & 367

Garner has

Pearson 367

Best Pictures of All Boat Projects

 

Replacing Through-Hulls and Seacocks

Main Cruising has done a wonderful job of presenting a picture process of how to install Through Hulls

Traditional Stuffing Box

Main Cruising has done a wonderful job of presenting a picture process of how to replace the flax packing

PSS Shaft Seal Installation

Main Cruising has done a wonderful job of presenting a picture process of how to install the PSS Shaft Seal

Public Journal

Log of the Sailing Vessel Cindy's Island

This is the chronicle (projects) of the adventures of the sailing vessel Cindy's Island and her crew, Cindy and Gray

Hanse 342

Pearson

323 Projects

Pearson

424 Projects

Thanks to

Pat Noordsij & Dave Jones

 


 

Top

[All Projects] [Projects by Roscoe] [Project Video] [Parts & Information] [Mast & Boom Work] [Raw Water Impeller] [Replacing the Prop Zinc] [Raw Water Filter] [Wet Exhaust] [Wind Speed Repair] [Teak Work] [Stuffing Box] [Sea Cocks] [Standing Rigging] [Steering Refurbish] [Cockpit Lockers] [Drop Table] [Build A Seahood] [Part of the ongoing maintenance for a 25 year old sailboat is cleaning the barnacles and critters off of the speed sensor ...] [Solar Panels] [Rub Rails] [Head Mirror & Towel Rack] [Windstar Rebuild] [Mast Removal & Stepping] [Motor Mounts] [Engine Maintenance] [Repowering] [Painting The Stove] [Prop & Shaft] [Anchor Sprit Support] [Painting the Deck] [Oil & Filter] [Wind Vane Repair] [Winch Re-Chroming] [VHF and Sterio] [New Stanchion] [New Lectra-San] [Mid Boom Travler] [Mast Post Support] [Achilles Inflatable] [